ANALITE-ISO7027/2

ISO7027 Probe installation optical clearance

Analite Probe Pipe Installation Application Note

ANALITE ISO7027 (90°) probe installation optical clearance

 

 

 

ANALITE-ISO7027ANALITE-ISO7027/2

ANALITE ISO7027 90° Probe Pipe Installation Arrangements

In all cases, the pipe must be completely filled with water without bubbles or foam. The flow rate and pipe geometry should be such that cavitation will not occur on the probe face. It is recommended the probe be fitted after a long straight run of pipe length as this will promote a smooth (laminar) flow at the point of measurement.

0 Comment

Leave a Comment

Your email address will not be published.

5 × 3 =